Land Development and Planning Project Files_4320 Intracoastal Dr._20230112_Development Application No. 22-0013TRANSMITTAL FORM
REPORT OF REVIEW &
ACTION BY PLANNING BOARD
Transmit to: Town Planner Ingrid Allen
Building Department
Date: January 18, 2023
Applicant/Owner: William R. Thomas
Property Address: 4320 Intracoastal Drive, Highland Beach, FL 33487
Property Control Number: 24-43-47-04-02-004-0150
Application No. 22-0013
Preliminary Review:
Final Review:install a 107 linear foot seawall, a 180 square foot dock, and a
27,000-pound capacity boat lift
Amended Site Plan Review
Other
AT THE January 12, 2023, MEETING, THE PLANNING BOARD REVIEWED THE ABOVE MATTER
PURSUANT TO CHAPTER 30 OF THE TOWN CODE OF ORDINANCES, AND HEREBY CERTIFIES
THAT THE FOLLOWING ACTION WAS TAKEN:
Denied
Recommendation to Approve
Approved with Modifications (as noted)
Other:
PLEASE TAKE WHATEVER ACTION IS REQUIRED TO COMPLETE THE SUBJECT MATTER, I.E.,
ISSUE PERMIT, TRANSMIT TO TOWN COMMISSION, RETURN TO APPLICANT, ETC.
IF THE ABOVE PLANS WERE DENIED OR APPROVED WITH MODIFICATIONS, PLEASE NOTE THE
BOARD’S FINDINGS:
MOTION: Mendelson/Demoss - Moved to approve (Development Order No. 22-
0013). Based upon roll call: Vice Chairperson Mendelson (Yes), Member
DeMoss (Yes), Member Brown (Yes), Member Powell (Yes), Member
Chudnofsky (Yes), and Chairperson Goldenberg (Yes). The motion passed
on a 6 to 0 vote.
CLERK’S OFFICE USE ONLY:
Transmitted to the Building Department: 01/18/2023
REVIEW GIVEN TO SUBJECT PROPERTY
PLANNING BOARD
STAFF REPORT
MEETING OF: JANUARY 12, 2023
TO: PLANNING BOARD
FROM: INGRID ALLEN, TOWN PLANNER
SUBJECT: APPLICATION BY WILLIAM R. THOMAS, UNLIMITED PERMIT
SERVICES INC., FOR A SPECIAL EXCEPTION APPROVAL TO
INSTALL A 107 LINEAR FOOT SEAWALL, A 180 SQUARE FOOT
DOCK, AND A 27,000 POUND CAPACITY BOAT LIFT FOR THE
PROPERTY LOCATED AT 4320 INTRACOASTAL DRIVE (DO# 22-
013)
Applicant (Property Owner): 4320 Intracoastal, LLC
130 S. 18 Street, Unit 2504
Philadelphia, PA 19103-4931
Applicant’s Agent: William R. Thomas
Unlimited Permit Services, Inc.
902 NE 1 Street, Suite 2
Pompano Beach, FL 33060
Property Characteristics:
Comprehensive Plan Land Use: Single Family
Zoning District: Residential Single Family (RS)
Site Location: 4320 Intracoastal Drive
Parcel PCN#: 24-43-47-04-02-004-0150
I. GENERAL INFORMATION:
HIGHLAND BEACH BUILDING DEPARTMENT
3614 S. Ocean Boulevard
Highland Beach, FL 33487
Ph: (561) 278-4540
Fx: (561) 265-3582
Page 11
Property Background:
In 2018, a building permit was issued for the demolition of an existing one-story structure (No. 18-
0505).
On November 10, 2021, a site plan was approved by the Planning Board (DO# 21-0012) for a new
three-story, 8,298 square foot, single family residence with pool and spa (motion carried 6-0).
Request and Analysis:
The Applicant is proposing to install a 107 linear foot seawall within 18 inches waterward of the
existing seawall, a 180 square foot concrete dock, and a 27,000-pound capacity elevator boat lift.
The Applicant has obtained both Florida Department of Environmental Protection (FDEP) and US
Army Corps of Engineers (ACOE) authorization for the proposed request . The corresponding file
numbers for each agency are provided in the table below.
FDEP (FILE NO.) ACOE (FILE NO.)
50-0180219-002,003-EE SAJ-2021-02738(NWGP-PWB)
Pursuant to Section 6-128(b) of the Town Code, all seawalls west of State Road A1A shall be at
Base Flood Elevation (BFE) or higher as provided by the FEMA FIRM maps . The BFE for the
property is currently at 6 feet. The Applicant’s proposed seawall is 6.0 feet NAVD.
Pursuant to Section 30-68(g)(6)d.1. of the Town Code, the Applicant’s request is in compliance
with the required 25-foot side yard setback for both docks and boatlifts located in a Single -family
zoning district. In addition, the proposed request is in compliance with the following definition of
“boat lift” as provided in Section 30 -131:
Boat lifts means the bottom of the keel of any boat shall not be hoisted greater than one foot
above the minimum seawall elevation. In no case shall the lift be higher than the
superstructure of the boat when lifted.
The Applicant’s request is consistent with the special exception provisions of Section 30-36 of the
Town Code, were applicable, and consistent with the Town Comprehensive Plan and Code of
Ordinances.
Pursuant to Section 30-67(b) of the Town Code, seawalls, docks, and boat lifts in the Residential
Single (RS) zoning district require special exception approval by the Planning Board. Section 30-
36(a) of the Town code states that the Planning Board may approve, approve with conditions, or
deny a request for special exception relating to seawalls, bulkheads, retaining walls and accessory
marine facilities.
If the Planning Board approves the request, the Applicant will be required to obtain a building permit
from the Town of Highland Beach Building Department following such approval and prior to
initiation of construction. Pursuant to Section 30-21(g) of the Town Code, commencement of
Page 12
construction shall be initiated within two (2) years following the date of approval by the Planning
Board.
Staff recommends approval of the special exception request to install a 107 linear foot seawall, a
180 square foot dock, and a 27,000 pound capacity boat lift, based on the plans date stamped
received by the Building Department on December 22, 2022.
Plans meet Town of Highland Beach Zoning and other governmental agencies
requirements and are consistent with the Town Comprehensive Plan.
Plans meet Town of Highland Beach Zoning requirements; however, approvals are
pending before the Town of Highland Beach will issue permits, with other
governmental agencies as listed.
Plans do not meet Town of Highland Beach Zoning requirements.
Should you have any questions, please feel free to contact me at (561) 637-2012 or
iallen@highlandbeach.us
Attachments: Application
Aerials
FDEP approval
ACOE approval
Applicant Plans
II. Recommendation
Page 13
244347040200401504320 Intracoastal DriveBel Lido Lot 15 Blk4xoffice@unlimitedps.net954-532-0129Install 107ft Seawall, install 36' x 5' concrete dock, install 27000 lb elevator boatliftBill ThomasUnlimited Permit Services902 NE 1st St. Pompano Beach, FL 33060Page 14
Page 15
4321
4317
4316
4320
4326 4325
Subject site
4320 Intracoastal Drive
State of Florida, Surdex GSI, Maxar, Microsoft
Highland Beach Boundary
Highland Beach Address Points
Highland Beach Parcels
12/22/2022, 1:16:56 PM 0 40 8020 ft
0 10 205 m
1:564
Town of Highland Beach
I. Allen
Page 16
Subject sitePage 17
’55.44”, Longitude W 80 ’11.39”
Page 18
- an agreement with the USACOE entitled “Coordination Agreement
Permit”, Section 10 of the Rivers and Harbor Act of 1899, and Section 404 of the Clean Water
Page 19
A person whose substantial interests are affected by the Department’s action
of each agency affected and each agency’s file or identification
representative; the name, address, and telephone number of the petitioner’s
the proceeding; and an explanation of how the petitioner’s substantial interests will
petitioner contends warrant reversal or modification of the agency’s proposed action;
sal or modification of the agency’s proposed action, including an explanation of
ishes the agency to take with respect to the agency’s proposed action.
Page 20
Department’s action m
Page 21
–
Page 22
Page 23
Page 24
Page 25
Page 26
Regulatory Division
Palm Beach Gardens Section
SAJ-2021-02 38(NWGP-PWB)
4320 Intracoastal,LLC
Attention:Michael Garnick
130 S 8th Street
Philadelphia,Pennsylvania 19103
Dear Mr. Garnick:
The U.S.Army Corps of Engineers (Corps)has completed the review of your
application for a Department of the Army permit,which the Corps received on August 5,
2021. Your application was assigned file number SAJ-2021-02 38(GP-PWB).A review
of the information and drawings provided indicates that the proposed work would
improve water access by replacing 107 linear feet of existing seawall within 1.5-feet
(wetface to wetface)a new 3.5 foot wide cap with 14 batter piles.Install a new 5-foot by
36-foot (180 square feet) concrete dock with 5 piles and a new boatlift with 2 aluminum
I-beams.The activities subject to this permit are authorized pursuant to authorities
under Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.§403).The project
is located within the Intracoastal Waterway at 4320 Intracoastal Drive, in Section 4,
Township 47 South,Range 43 East,Highland Beach, Palm Beach County,Florida.
The aspect of your project involving installing a seawall,as depicted on the attached
drawings,is authorized by Nationwide Permit 13 (NWP-13),Bank Stabilization,which
became effective on March 15,2021 (86 FR 2744,January 13,2021).This verification
is valid until March 14,2026..In order for this NWP authorization to be valid,you must
ensure that the work is performed in accordance with the Nationwide Permit General
Conditions,the Jacksonville District Regional Conditions,and the General and Project-
Specific Special Conditions listed below. Furthermore,if you commence or are under
contract to commence this activity before the date that the relevant nationwide permit is
modified or revoked,you will have 12 months from the date of the modification or
revocation of the NWP to complete the activity under the present terms and conditions
of this NWP.Alternatively, you can access the U.S.Army Corps of Engineers'(Corps)
Jacksonville District's Regulatory Source Book web page for links to view Nationwide
Permit information at:https://www.saj.usace.army.mil/Missions/Regulatory/Source-
Book/. Please be aware this Internet address is case sensitive and should be entered
as it appears above.Once there you will need to select select
authorization,the Nationwide Permit general conditions,and the regional conditions,
which apply specifically to this NWP verification.
DEPARTMENT OF THE ARMY
CORPS OF ENGINEERS,JACKSONVILLE DISTRICT
4400 PGA BOULEVARD, SUITE 500
PALM BEACH GARDENS, FLORIDA 33410
March 7, 2022
Page 27
This letter verifies your project,as described above and depicted on the enclosed
drawings,is authorized by Regional General Permit (RGP) SAJ-20 and any subsequent
modifications,if applicable.This RGP authorization is valid until March 27,2023.
Please access the Corps' Jacksonville District Regulatory Division Source Book
webpage to view the special and general conditions for SAJ-20,which apply specifically
to this authorization.The Internet URL address is:
http://www.saj.usace.army.mil/Missions/Regulatory.aspx.Please be aware this Internet
address is case sensitive;and you will need to enter it exactly as it appears above.
Once there select select
need to select the specific SAJ permit noted above.
You must comply with ALL the RGP general and special,attached and/or
incorporated by reference, and the Project Specific Special Conditions and
General Conditions, listed below, or you may be subject to enforcement action.
Project Specific Special Conditions:
The following project specific special conditions are included with this verification:
1.Reporting Addresses:The Permittee shall submit all reports, notifications,
documentation and correspondence required by the general and special conditions of
this permit to either (not both) of the following addresses:
a.For electronic mail (preferred):SAJ-RD-Enforcement@usace.army.mil (not to
exceed 15 MB).
b.For standard mail:U.S.Army Corps of Engineers, Regulatory Division,
Enforcement Section, P.O. Box 4970, Jacksonville,FL 32232-0019.
The Permittee shall reference this DA permit number,SAJ-2021-02 38(NWGP-PWB),
on all submittals.
2.Commencement Notification:Within 10 days from the date of initiating the
work authorized by this permit the Permittee shall submit a completed Commencement
Notification form (Attachment B).
3.As-Built Certification with X-Y Coordinates:Within 60 days of of
the authorized work or at the expiration of the construction window of this permit,
whichever occurs first, the Permittee shall submit as-built of the authorized
work and complete the enclose As-Built Certification by Professional Engineer or
Page 28
)to the Corps. The drawings shall be signed sealed
by a registered professional engineer or a professional land surveyor confirming the
actual location of all authorized work/structures with respect to the Federal channel
and/or within the Federal easement and include the following :
a. A plan view drawing of the location of the authorized work footprint (as shown on
the permit drawings) with an overlay of the work as constructed in the same scale as
the attached permit drawings (8½-inch by 11-inch). The drawings shall include th e X &
Y State Plane coordination points of the most water -ward point of the structure. The
drawings shall include the dimensions of the structure, depth of water (at mean low
water) at the waterward end of the structure, and the distance from the waterwar d end
of the structure to the near design edge of the Federal channel.
b. List of any deviations between the work authorized by this permit and the work as
constructed. In the event the completed work deviates, in any manner, from the
authorized work, describe on the As-Built Certification Form the deviations between the
work authorized by this permit and the work as constructed. Clearly indicate on the as -
built drawings any deviations that have been listed. Please note the depiction and/or
description of any deviations on the drawings and/or As -Built Certification Form does
not constitute approval of any deviations by the Corps.
c. The Department of the Army Permit number.
4.Assurance of Navigation and Maintenance:The permittee understands and
agrees that, if future operations by the United States require the removal, relocation, or
other alteration, of the structures or work herein authorized, or if, in the opinion of the
Secretary of the Army or his authorized representative,said structure or work shall
cause unreasonable obstruction to the free navigation of the navigable waters, the
Permittee will be required, upon due notice from the U.S. Army Corps of Engineers, to
remove, relocate, or alter the structural work or obstructi ons caused thereby, without
expense to the United States. No claim shall be made against the United States on
account of any such removal or alteration .
5.Setback from Federal Channel:The permit requires that no portion of the
authorized structure extend closer than 48.2 linear feet from the near bottom edge of
the federal channel.
6.Consent to Easement:A portion of the authorized work may be located within
the Federal right-of-way and therefore, may require a Department of the Army Consent
Division for action on the Consent to Easement. Prior to commencement of
construction, the Permittee shall provide a copy of the Corps approved Consent to
Page 29
Easement to the address identified in Reporting Addresses Special Condition .The
Real Estate Division is responsible for issuing the Consent to Easement. For questions
or status updates on the Consent to Easement, please contact Real Estate Division at
SAJ-RE-Consent@usace.army.mil or Post Office Box 4970, Jacksonville, Florida
32232-0019 or by telephone at 904-570-4515.
7.Manatee Conditions:The Permittee shall comply with the enclosed
(Attachment D ndard Manatee Conditions for In -Water Work
8.Jacksonville District Programmatic Biological Opinion (JAXBO):Structures
and activities authorized under this permit will be constructed and operated in
accordance with all applicable PDCs contained in the JAXBO, based on the permitted
activity. Failure to comply with applicable PDCs will constitute noncompliance with this
permit. In addition, failure to comply with the applicable PDCs, where a take of listed
species occurs, would constitute an unauthorized take. The NMFS is the appropriate
authority to determine compliance with the Endangered Species Act. The most current
version of JAXBO can be accessed at the Jacksonville District Regulatory Division
website in the Endangered Species section of the Sou rcebook located at:
http://www.saj.usace.army.mil/Missions/Regulatory/SourceBook.aspx
9.Cultural Resources/Historic Properties:
a. No structure or work shall adversely affect impact or disturb properties listed in the
National Register of Historic Places (NRHP) or those eligible for inclusion in the NRHP.
b.If during the ground disturbing activities and construction work within the permit
area, there are archaeological/cultural materials encountered which were not the
subject of a previous cultural resources assessment survey (and which shall include,
but not be limited to: pottery, modified shell, flora,fauna, human remains, ceramics,
stone tools or metal implements, dugout canoes, evidence of structures or any other
physical remains that could be associated with Native American cultures or early
colonial or American settlement), the Permittee shall imme diately stop all work and
ground-disturbing activities within a 100-meter diameter of the discovery and notify the
Corps within the same business day (8 hours). The Corps shall then notify the Florida
State Historic Preservation Officer (SHPO) and the app ropriate Tribal Historic
Preservation Officer(s) (THPO(s)) to assess the significance of the discovery and devise
appropriate actions.
c.Additional cultural resources assessments may be required of the permit area in
the case of unanticipated discoveries as referenced in accordance with the above
Special Condition ; and if deemed necessary by the SHPO, THPO(s), or Corps, in
Page 30
accordance with 36 CFR 800 or 33 CFR 325, Appendix C (5). Based, on the
circumstances of the discovery, equity to all parties , and considerations of the public
interest, the Corps may modify, suspend or revoke the permit in accordance with 33
CFR Part 325.7. Such activity shall not resume on non -federal lands without written
authorization from the SHPO for finds under his or he r jurisdiction, and from the Corps.
d.In the unlikely event that unmarked human remains are identified on non -federal
lands; they will be treated in accordance with Section 872.05 Florida Statutes. All work
and ground disturbing activities within a 100-meter diameter of the unmarked human
remains shall immediately cease and the Permittee shall immediately notify the medical
examiner, Corps, and State Archaeologist within the same business day (8 -hours). The
Corps shall then notify the appropriate S HPO and THPO(s). Based, on the
circumstances of the discovery, equity to all parties, and considerations of the public
interest, the Corps may modify, suspend or revoke the permit in accordance with 33
CFR Part 325.7. Such activity shall not resume witho ut written authorization from the
State Archaeologist and from the Corps.
10. Notice of Permit:
E) with the Clerk of the Circuit Court,
Registrar of Deeds or other appropriate official charged with the responsibility of
maintaining records of title to or interest in real property within the county of the
authorized activity. Within 90 days from the effective date of this permit, the Permittee
shall provide a copy of the recorded Notice of Permit to the Corps clearly showing a
stamp from the appropriate official indicating the book and page at which the Notice of
Permit is recorded and the date of recording.
11.Water Quality Certification and Coastal Zone Management:Prior to the
initiation of any construction, projects qualifying for this DA perm it must qualify for an
exemption under section 403.813(1), Florida Statutes or 373.406, Florida Statutes, or
otherwise be authorized by the applicable permit required under Part IV of Chapter 373,
Florida Statutes, by the Department of Environmental Protec tion, a water management
district under section 373.069, Florida Statutes, or a local government with delegated
authority under section 373.441, Florida Statutes, and receive Water Quality
Certification and applicable Coastal Zone Consistency Concurrence o r waiver thereto,
as well as any authorizations required for the use of state owned submerged lands
under Chapter 253, Florida Statutes, and, as applicable, Chapter 258, Florida Statutes.
You should check State permitting requirements with the Florida Depa rtment of
Environmental Protection or the appropriate water management district.
General Conditions (33 CFR PART 320 -330):
Page 31
1.The time limit for completing the work authorized ends on March 27, 2023.
2.You must maintain the activity authorized by this permit in good condition and in
conformance with the terms and conditions of this permit. You are not relieved of this
requirement if you abandon the permitted activity, although you may make a good faith
transfer to a third party in compliance with General Condition 4 below. Should you wish
to cease to maintain the authorized activity or should you desire to abandon it without a
good faith transfer, you must obtain a modification of this permit from this of fice, which
may require restoration of the area.
3.If you discover any previously unknown historic or archeological remains while
accomplishing the activity authorized by this permit, you must immediately notify this
office of what you have found. We will initiate the Federal and state coordination
required to determine if the remains warrant a recovery effort of if the site is eligible for
listing in the National Register of Historic Places.
4.If you sell the property associated with this permit you must obtain the signature
of the new owner on the transfer form attached to this letter and forward a copy to this
office to validate the transfer of this authorization.
5.If a conditioned water quality certification has been issued for your project, you
must comply with the conditions specified in the certification as special conditions to this
permit.
6.You must allow a representative from this office to inspect the authorized activity
at any time deemed necessary to ensure that it is being or has been accomplished in
accordance with the terms and conditions of your permit.
Page 32
This letter of authorization does not give absolute Federal authority to perform the
work as specified on your application. The proposed work may be subject to local
building restrictions mandated by the National Flood Insurance Program. You should
contact your local office that issues building permits to determine if your site is located
in a flood-prone area, and if you must comply with the local building requirements
mandated by the National Flood Insurance Program.
This letter of authorization does not preclude the necessity to obtain any other
Federal, State, or local permits, which may be required.
Thank you for your cooperation with our permit program. The Jacksonville
District Regulatory Division is committed to improving service to our customers. We
strive to perform our duty in a friendly and timely manner while working to preserve our
environment. We invite you to complete our automated Customer Service Survey at
https://regulatory.ops.usace.army.mil/customer -service-survey/.Please be aware this
Internet address is case sensitive; and, you will need to enter it exactly as it appears
above.Your input is appreciated favorable or otherwise.
Should you have any questions related to this RGP verification or have issues
accessing the documents reference in this letter , please contact Paula Bratschi at the
letterhead address above,via telephone at 561-472-3532,or via e-mail at
paula.w.bratschi@usace.army.mil.
Sincerely,
Paula Bratschi
Project Manager
Enclosures:
Attachment A: Drawings
Attachment B:Commencement Notification
Attachment C:As-Built Certification with X-Y Coordinates
Attachment D:Manatee Conditions for In-Water Work
Attachment E:Notice of Permit
Cc:
Matt Butler mbutler@coastal-engineers.com
CESAJ-RD-PE
Page 33
DEPARTMENT OF THE ARMY PERMIT TRANSFER REQUEST
DA PERMIT NUMBER:SAJ-2021-02738(NWGP-PWB)
When the structures or work authorized by this permit are still in existence at the time
the property is transferred, the terms and conditions of this permit will continue to be
binding on the new owner(s) of the property.Although the construction period for works
authorized by Department of the Army permits is finite, the permit itself, with its
limitations, does not expire.
To validate the transfer of this permit and the associated responsibilities associated
with compliance with its terms and conditions, have the transferee sign and date below
and mail to the U.S. Army Corps of Engineers, Enforcement Section, Post Office Box
4970, Jacksonville, FL 32232-0019 or submit via electronic mail to:
SAJ-RD-Enforcement@usace.army.mil (not to exceed 15 MB).
______________________________________________________________
(TRANSFEREE-SIGNATURE)(SUBDIVISION)
________________________________________________________
(DATE)(LOT)(BLOCK)
__________________________
___________________________________(STREET ADDRESS)
(NAME-PRINTED)
___________________________________
___________________________________
(MAILING ADDRESS)
___________________________________
(CITY, STATE, ZIP CODE)
Page 34
Page 35
Page 36
Page 37
Page 38
Dated 9/18/2019
COMMENCEMENT NOTIFICATION
Within ten (10) days of initiating the authorized work, submit this form via electronic mail to
saj-rd-enforcement@usace.army.mil (preferred, not to exceed 15 MB)or by standard mail
to U.S. Army Corps of Engineers, Enforcement Section, P.O. Box 4970, Jacksonville, FL
32232-0019.
1.Department of the Army Permit Number:SAJ-2021-02738(NWGP-PWB)
2.Permittee Information:
Name:__________________________________________
Email:__________________________________________
Address:__________________________________________
__________________________________________
Phone:__________________________________________
3.Construction Start Date: ______________________
4.Contact to Schedule Inspection:
Name:__________________________________________
Email:__________________________________________
Phone:__________________________________________
______________________________
Signature of Permittee
______________________________
Printed Name of Permittee
______________________________
Date
Page 39
AS-BUILT CERTIFICATION BY PROFESSIONAL ENGINEER
Submit this form and one set of as-built engineering drawings to the U.S. Army Corps of
Engineers, Enforcement Section,4400 PGA Boulevard, Suite 500,Palm Beach Gardens,Florida,
33410.For electronic mail saj-rd-enforcement@usace.army.mil (not to exceed 10 MB).If you
have questions regarding this requirement, please contact the Enforcement Branch at 904-232-
3131.
Department of the Army Permit Number:SAJ-20 1-02738(NW/GP-
PWB)
Permittee Information:
Name:_____________________________________________
Address:_____________________________________________
_____________________________________________
3.Project Site Identification (physical location/address):
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
4.As-Built Certification: I hereby certify that the authorized work, including any mitigation required
by Special Conditions to the permit, has been accomplished in accordance with the Department of
the Army permit with any deviations noted below. This determination is based upon on-site
observation, scheduled, and conducted by me or by a project representative under my direct
supervision. I have enclosed one set of as-built engineering drawings.
_______________________________________________________________________
Signature of Engineer Name (Please type)
_______________________________________________________________________
(FL, PR, or VI)Reg. Number Company Name
_________________________________________________________________
City State ZIP
(Affix Seal)
__________________________________________________________________________
Page 40
-2-
Date Telephone Number
Date Work Started:____________________ Date Work Completed:______________________
Identify any deviations from the approved permit drawings and/or special conditions (attach
additional pages if necessary):
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
Page 41
STANDARD MANATEE CONDITIONS FOR IN-WATER WORK
2011
The permittee shall comply with the following conditions intended to protect manatees from direct project
effects:
a.All personnel associated with the project shall be instructed about the presence of manatees and
manatee speed zones, and the need to avoid collisions with and injury to manatees.The
permittee shall advise all construction personnel that there are civil and criminal penalties for
harming, harassing, or killing manatees which are protected under the Marine Mammal Protection
Act,the Endangered Species Act, and the Florida Manatee Sanctuary Act.
b.All vessels associated with the construction project shall operate at "Idle Speed/No Wake”at all
times while in the immediate area and while in water where the draft of the vessel provides less
than a four-foot clearance from the bottom. All vessels will follow routes of deep water whenever
possible.
c.Siltation or turbidity barriers shall be made of material in which manatees cannot become
entangled,shall be properly secured, and shall be regularly monitored to avoid manatee
entanglement or entrapment. Barriers must not impede manatee movement.
d.All on-site project personnel are responsible for observing water-related activities for the presence
of manatee(s).All in-water operations, including vessels, must be shutdown if a manatee(s)
comes within 50 feet of the operation. Activities will not resume until the manatee(s) has moved
beyond the 50-foot radius of the project operation, or until 30 minutes elapses if the manatee(s)
has not reappeared within 50 feet of the operation.Animals must not be herded away or harassed
into leaving.
e.Any collision with or injury to a manatee shall be reported immediately to the Florida Fish and
Wildlife Conservation Commission (FWC)Hotline at 1-888-404-3922. Collision and/or injury
should also be reported to the U.S. Fish and Wildlife Service in Jacksonville (1-904-731-3336) for
north Florida or Vero Beach (1-772-562-3909)for south Florida, and to FWC at
ImperiledSpecies@myFWC.com
f.Temporary signs concerning manatees shall be posted prior to and during all in-water project
activities. All signs are to be removed by the permittee upon completion of the project.Temporary
signs that have already been approved for this use by the FWC must be used.One sign which
reads Caution: Boaters must be posted. A second sign measuring at least 8 ½”by 11"explaining
the requirements for “Idle Speed/No Wake”and the shut down of in-water operations must be
posted in a location prominently visible to all personnel engaged in water-related activities.These
signs can be viewed at MyFWC.com/manatee. Questions concerning these signs can be sent to
the email address listed above.
Page 42
Page 43
Prepared by:
Permittee: ____________________________
Address: _____________________________
_____________________________________
Phone:_______________________________
NOTICE OF DEPARTMENT OF THE ARMY PERMIT
TAKE NOTICE the United States Army Corps of Engineers (Corps)has issued a permit
or verification SAJ-2021-02738 to 4320 Intracoastal, LLC (Permittee) on March 7,2022,
authorizing work in navigable waters of the United States in accordance with Section 10
of the Rivers and Harbors Act of 1899 (33 U.S.C 403)on a parcel of land known as
Folio/Parcel ID:_______________located at 4320 Intracoastal Drive ,in Section 4,
Township 47 South, Range 43 East,Highland Beach,Palm Beach County, Florida.
Within 30 days of any transfer of interest or control of said property, the Permittee must
notify the Corps in writing of the property transfer by submitting the completed permit
transfer page included with the issued permit or verificat ion.The subject permit or
verification concerns only that portion of the property determined to fall within the
jurisdiction of the Corps and this notice is applicable only to those portions of the subject
property in, over, under, or affecting navigable waters of the United States .
Conditions of the Permit/Verification:The permit or verification is subject to General
Conditions and Special Conditions which may affect the use of the work authorized in
Intracoastal Waterway. Accordingly, interested parties should closely examine the
entire permit or verification, all associated applications, and any subsequent
modifications.
To obtain a copy of the authorization in its entirety submit a written request to:
U.S. Army Corps of Engineers
Regulatory Division -Special Projects &Enforcement Branch
Post Office Box 4970
Jacksonville, Florida 32232-0019
Questions regarding compliance with these conditions should be directed to :
U.S. Army Corps of Engineers
Enforcement Section
Post Office Box 4970
Jacksonville, Florida 32232-0019
Conflict Between Notice and Permit
This Notice of Authorization is not a complete summary of the issued permit or
verification. Provisions in this Notice of Permit shall not be used in interpreting the
permit or verification provisions. In the event of conflict between this Notice of Permit
and the permit or verification, the permit or verification shall control.
Page 44
This Notice is Not an Encumbrance
This Notice is for informational purposes only. It is not intended to be a lien,
encumbrance, or cloud on the title of the premises.
Release
This Notice may not be released or removed from the public records without the prior
written consent of the Corps.
This Notice of Authorization is executed on this ________ day of
_____________________,_______. This document is being submitted for recordation
in the Public Records of Palm Beach County, Florida as part of the requirement
imposed by the authorization SAJ-2021-02738 issued by Corps.
Permittee:
________________________________
Address:
_________________________________
_____________________________________
Phone:________________________________
STATE OF FLORIDA
COUNTY OF _____________
The foregoing instrument was acknowledged before me this ________day of
__________________, 20____, by _________________, who is personally known to
me or has produced __________________________ as identification.
________________________________
___
Notary Public
(seal)
___________________________________
Print
My Commission Expires____________
Page 45
Page 46
Page 47
Page 48
Page 49
Page 50
Page 51
Page 52
Page 53
Page 54
Order ID:7347994
Page 1 of 3
12/20/2022 3:01:33 PMPrinted:
GROSS PRICE * :
* Agency Commission not included
SSC_Notice of Public MeetingPACKAGE NAME:
Page 55
Product(s): Sun Sentinel, Affidavit, Floridapublicnotices.com, Classified.ss.com_Legal
AdSize(s):1 Column
Run Date(s):Thursday, February 2, 2023
Zone:Full Run
Color Spec.B/W
Preview
Order ID:7347994
Page 2 of 3
12/20/2022 3:01:33 PMPrinted:
GROSS PRICE * :
* Agency Commission not included
SSC_Notice of Public MeetingPACKAGE NAME:
Page 56
Order ID:7347994
Page 3 of 3
12/20/2022 3:01:33 PMPrinted:
GROSS PRICE * :
* Agency Commission not included
SSC_Notice of Public MeetingPACKAGE NAME:
Page 57
File Attachments for Item:
B. 2023 PROPOSED PLANNING BOARD MEETING DATES
Page 58
TOWN OF HIGHLAND BEACH
AGENDA MEMORANDUM
MEETING TYPE: Planning Board
MEETING DATE 01/12/2023
SUBMITTED BY: Ganelle Thompson, Administrative Support Specialist
SUBJECT: 2023 PROPOSED PLANNING BOARD MEETING DATES
SUMMARY:
Below are the 2023 proposed Planning Board meeting dates, which will be held on the second
Thursday of each month at 9:30 A.M. The meeting dates are as follows:
PLANNING BOARD MEETING DATES
January 12, 2023 July 13, 2023
February 09, 2023 August 10, 2023
March 09, 2023 September 14, 2023
April 13, 2023 October 12, 2023
May 11, 2023 November 09, 2023
June 08, 2023 December 14, 2023
FISCAL IMPACT:
N/A
ATTACHMENTS:
N/A
RECOMMENDATION:
Staff recommends approval of the proposed 2023 Planning Board meeting dates.
Page 59