1969.07.26_TC_MinutesI
C7
MINUTES - WORKSHOP MEETING OF THE TOWN COMMISSION - July 26, 1969
~ workshop meeting of the Town Commission was called. to order by Mayor
Horton on July 26, 1969 at 9:30 A. M. Present were Mayor Horton, Comm.
Beekman, Hackman; Messers Walton, Burnside, @urry and. Klinck from Russell
& Axon, Rodgers, Michelli, Spinnenwueber, Novotny, a representative from
Radice Realty and John Stenfel with the Florida Atlantic Builders Assoc.
Mayor Horton announced. Mr. Goodwin, the electrical inspector is resigning
Augugt 1st and. that Mr. Crego recommended. hiring Byron Custer, employed.
as Air conditioner inspector for Boca Raton and. holding a master electrician
certificate, to replace him. It was agreed. to do so.
The Mayor explained. to those in attendance the present status of the sewer
plans and, he would. like to discuss the problems involved. in financing fir
sewers in the entire Town, stating that it would. be more economical to do
this complete system as one unit, instead. of in sections. Mr. Klinck said.
the estimated. cost is $ 525,000. plus engineering and. possible legal fees,
and, further suggested. that this system is more economical for large devel-
opments than separate sewage treatment plants. Since it is doubtful if a
referendum vote for a bond. issue would. pass, the dilemma of how to finance
this was explained,. There are 1000 units as an approximate estimate in
the next two years. Further discussion was held. and. Mr. Stanfel volunteered.
to arrange for a meeting, of builders to discuss financing, as no state or
federal funds are available at this time. The Mayor offerred the Commission's
help but reminded, those present that this is really the developers problem.
The meeting was adjourned at 11:00 A. M.
,.-----
APPROVED : r , ~ ~~ lO-YL-~
ATTEST- ~~i„%L~ 1~",.1/~
.Town Clerk
•