1964.08.02_TC_MinutesM I N U T E 5: TOWN C)P HIGHLAI~ -BEACH --- SPECIAL MEETING
AUGUST 2, 1964, 10:00 AM;~
.A special meeting called by Mayor Hackman at the request of Town Mgr.
Dailey to discuss the Bel Lido Development. Cc~mms. Hackman, Bunn, aad
Johnson, and Taaea Mgr. Dailey were present, also in attendance were
Mr. Peter ~F~?giia, representing Bel Lido and Mr. Burt Boldt representing
Zinke-Smith. The purpose of this mee#ing was to get mutual understand-
ing and agreement on construction work planned for the subdivision. Mr.
Foglia stated that delay in developing plans was due to lack of co-roper-
ation from the Z~own Council, his partner, and some lot owners. He said
the Town Council had not tried to be helpful and cited the incident when
the water was shut off without notice and the ro al palms died. Asked
about present work to be done he advised that.~~o o Feet of bulkhead is
to be installed and six model homes will be built by Rice Chadwick on
lots they own. This lead to the question of inspection and repair work
on the bridge.
Dr. Dailey read a Brockway, tiVeber & Brockway letter of April 3, 1957
which stated that their first inspection was made when the bridge was
substantially complete making it impossible to determine whit material
went into it. ~ilso a letter of September 1957 which stated that the
approaches to the. bridge were tc,o low. Mr. Foglia answered that there
was no provision made for inspection eo st along with the permit and
that previous inspections were denied by Mr. Hartwig due to the cos t•
to the town of about $100.00 per inspection.
After a lengthy question and an sorer period it was agreed that;
ZINKE SMITH would place material at bridge ends to even the approach
and watch the load limits and speed of trucks.
~~~'~ Peet of .bulkhead would be installed under permit and inspections.
Permanent repair of bridge approaches and replacement of sheet piling
& tie rods to be taken care of by Zinke Smith and Mr. Foglia, under
Town Engineers inspection on completion of bulkhead work. Bulldozing
and cleaning of lots will also be done after bulkhead work.
Mr. Foglia will `post a $10,000.00 Bond on the entre;agreement and wi I1
verify by letter what they plan to do. APFRCNED ~~g Y--~~ G ~C
••..•••..~.+•..~.a~T..~.,
ATTEST:
•