Loading...
1975.06.24_TC_Minutes_Workshop. TOWN OF HIGHLAND BEACH, FLORIDA TOWN COMMISSION WORKSHOP Tuesday, June 24, 1975 9:30 A.M. Mayor Morton E. Gilday called the Regular Workshop meeting to order. Present were: Morton E. Gilday, Mayor Leslie W. Joy, Vice Mayor Commissioner Harry Bauer Commissioner Robert D. Clark Also present: Commissioner Ruth Mumford Absent Town Manager, Elaine W. Roberts Town Clerk, Kathryn M. Borgemenke • Mayor Gilday stated to the Commission that Mr. Robert P. Jornayvaz wished to be heard at this time relative to his water bill. Mr. Jornayvaz presented his case to the Commission. The Commission suggested that Mr. Jornayvaz request in writing a verification of his water meter. He agreed with this suggestion. New Sewer Line - Penthouse Highlands to Lift Station No. 2. __r Mrs. Roberts reported on the new force main to be installed on the west side of AIA between the bicycle path and the edge of the pavement. She stated that she had requested the contractors to get the smallest pieces of equipment or do the job by hand if they had to; to ensure that the property abutting the work will not be disturbed any further. A great deal of discussion followed relative to the replacement of the line from the West side to the East side of the highway. It was decided that the line not be relocated. • Workshop • June 24, 1975 $age -2- Cable TV - Ordinance - March 21, 1975 Mrs. Roberts explained that she had been asked the status of this item,and she thought the Commission would express their wishes relative to this Ordinance. Mayor Gilday asked if "Leadership" had been contacted to determine if the Ordinance would still be agreeable to them. The Mayor suggested that the Town Manager have a meeting with a representative of "Leadership" tv see if they wished to go forward with the franchise and if so, that the Commission go ahead with a first reading. Discussion followed pertaining to underground as opposed to overhead lines, the cost per subscriber, subscription to service being voluntary, etc. It was suggested to have a Special Meeting and first reading in Auqust and the final reading at the Regular Meeting, • September 2, 1975. Th+e Workshop recessed at 10:15 A.M. to enable the Commission to have the scheduled Public Hearing on two ordinances: One pertaining to RPUD-l, RPUD-2, and RPUD-3, and one amending the Sewer Franchise. The Workshop Meeting reconvened at 11:15 A.M. Police Department - Discussion of Possible Re-election Collective~Bargaininq Representative Mrs. Roberts noted that the Police Department had an election to choose a Representative for Collective:~Bargaining. • Workshop June 24, 1975 Page -3- • After much discussion relative to an additional election, cost of another election, waiver, acknowledgment of F.O.P., the Mayor suggested that Mrs. Roberts check with a representative of P.E.R.C. or Dr. Remington as to a waiver and/or the proper procedure to follow. CARR Proposal - Bike Path Mrs. Roberts noted that the fill she obtained south from Mr. Kemery's house to almost Mr. Slagle's house along the bike path would not hold in the event of high tides. One bid was received for grading and sodding. It was the unanimous consensus of the Commission that this item be included on the Regular Meeting to be held on Tuesday, July 1, 1975. Russell and Axon - Letter - June 17, 1975 - Wells Certification Mrs. Roberts explained that this was an updated letter including cost estimates for all the enginee~~~~ work necessary to obtain ~a// r Mrs. Roberts asked if the Commission ~+rished Russell and Axon to work on this project. the permits from the South Florid anagement District for certification of the Town's wells. Russell and Axon has now estimated the cost to be between $2,500 ~- $3,500 as opposed to $8,500 - $10,000. A member of the Flood Control District has advised the Town Manager that we might do this work our- selves; if so, they would offer assistance in preparing the forms. It was the recommendation of the Town Manager that either she and Vice Mayor Joy work on this project or if this is not possible, hire a different Engineering firm. • Workshop • June 24, 1975 Page -4- CORRESPONDENCE• (a) Highland Beach Utility Company - Bond Mrs. Roberts stated she had asked each Commissioner. if they would accept the recommendations of Russell and Axon which were to be: provide for a bond in the amount of $175,000 for the completion of the Sewer System and $25,000 for the completion of the Sewage Interim Treat- ment Plant. All four Commissioners were in agreement. Mrs. Roberts went on to explain further. Messrs. Urbanek, Delaney and Totz spoke relative :to this subject. It was noted that if the amount of the Bond should be changed the Ordinance relating to the Amendment of the • Sewer Franchise would have to revert to the first reading. Mayor Gilday suggested to Mr. Urbanek that he put his proposal in written form through his attorney to Mr. Sliney, Town Attorney. (b) better to Boca Hi - Sewer System Odor Mrs. Roberts explained the letter to Boca Hi about sewer system odor. Mr. Murphy, the resident manager, stated to Mrs. Roberts that he has retained the engineer who designed the lift station, pump and internal sewage system and that they mould start chlorination last Friday. Discussion regarding this problem followed. Mr. Delaney asked to talk to the Commission about the Bond for the sewer. They Mayor agreed. Again, a great deal of discussion followed regarding this matter. LJ Workshop June 24, 1975 Page -5- (c) DOT - Fire Hydrant Access A very brief discussion relative to this matter followed. The Town Manager suggested the Commissi on refer to the clipboard for this item, and if any quesltions should arise she would be available to answer them. (d) FAA - Regulations Pertaining to Elevated Water Tank It was established that it was not necessary to place a light on top of the water tank per FAA. John O'Grady stated that a notice to Airmen.. went to all airports in the area and as far as Atlanta. (e) County Board of Health - Test on Water Lines Mrs. Roberts stated that testing on water lines has • been completed and passed. These are chlorination tests. TOWN MANAGER - Discussion of Weekly Report.- June 9 through June 13, 1975 Commissioner Bauer commented that he likes the report. There was no further discussion. DOT - Discussion of approved t~1an - Deceleration Lane at Town Hall Site Mrs. Roberts stated that DOT has approved this deceleration lane. She requested the wishes of the Commission, after their review. • Workshop • June 24, 1975 Page -6- Comments from Town Commission - The Operating Permit for the S.I.T.P, to the Florida D.P.C. Mrs. Roberts and Mayor Gilday will go over this application. It was established that this was not a final approval and just an extension of the application that expired April 30, 1975. A brief discussion followed regarding the RPUD 10-year limitation, Highland Beach Tax Base and a meeting with Mr. Cashman, relative to the agreement between Webb and Lauderdale. The Workshop Meeting was adjourned at 12:20 P.1~I. ~, APPROVED: ATTEST: Town Clerk '/ 4 '^` -- t_..- 197 5 Dated: c~~E:~- •