Loading...
1993.01.26_BAA_Minutes_Regular,. } t ~- TOWN OF HIGHLAND BEACH BOARD OF ADJUSTMENT QUARTERLY MEETING - MINUTES Tuesday, January 26, 1993 9:30 A.M. Chairman Harold B. Cohen called the Quarterly Meeting to order in Com- mission Chambers at 9:30 A.M. He announced that immediately following this meeting, a Workshop would be held regarding Petition for Variance 1-93-47. Deputy Town Clerk Doris Trinley called the roll. Present were the Chairman and Members Jane Rayner, Robert F. Selby, Daniel C. Stump, Richard C. Seguso and Neil W. Burd. Member Benjamin Cohen was absent. Building Official Lee Leffingwell and Town Attorney Carol Sullivan were also present, as were members of the general public. ELECTION OF OFFICERS Harold B. Cohen was re-elected Chairman by unanimous vote upon Motion by Mr. Selby/Mr. Burd. Robert F. Selby was elected Vice Chairman by unanimous vote upon Motion by Chairman Cohen/Mr. Seguso. The Chairman indicated he would like to reinstate having a Member serve as Secretary of the Board and nominated Jane Rayner. Mr. Stump seconded, followed by all favorable votes. Mrs. Rayner will review Minutes of Board of Adjustment meetings before a draft is submitted to Members for their consideration. MINUTES Upon Motion by Mrs, Rayner, Mr. Selby, the Minutes of the October 20, 1992 Quarterly Meeting were unanimously approved. DISCUSSION Before addressing the next agenda item, Chairman Cohen formally wel- comed recently appointed Member Neil W. Burd, noting his impressive background, which will be a decided asset regarding the work of the Board. Status of Building Development Ms. Leffingwell brought the members up-to-date regarding the Ocean Place (Lots 20-28E) project and answered members' questions satis- factorily. • There being no further business to come before the Board at this time the meeting was adjourned upon Motion by Mr. Stump/Mr. Seguso at 9:40 A.M. dmt Board of Adjustment Quarterly Meeting - Minutes January 26, 1993 Page 2 of 2 APPROVE : t~b~~-~--~`c-~^ - aro o e airman Ro er F. SeT6y, Vice C airman '~ ~~ Vane Rayner, Secre a G~~~~ • ATTEST: DATE: Nei Bur ~~ 3 TOWN OF HIGHLAND BEACH BOARD OF ADJUSTMENT WORKSHOP - MINUTES Tuesday, January 26, 1993 9:40 A.M. Chairman Harold B. Cohen called the Workshop Meeting to order in Com- mission Chambers at 9:40 A.M., immediately following the Quarterly Meeting. Deputy Town Clerk Doris Trinley called the roll. Present were the Chairman, Vice Chairman Robert F. Selby, Secretary Jane Rayner and Members Daniel C. Stump, Richard C. Seguso and Neil W. Burd. Also present were Building Official Lee Leffingwell, Town Attorney Carol Sullivan and members of the general public. Petition No. 1-93-47. Request submitted by M/M Jose Andreu, 4201 Tranquility Dr., Block 5, Lot il, Bel Lido, Seeking Relief of Side Setback from 4' Requirement to 1'. Town Code of Ordinances Chapter 30, Section 5 2(b)(2) [Accessory Uses and Structures; Pools and Pool Decks] Chairman Cohen advised no decision would be made at this meeting; he lso noted that after all presentations had been made, he would recess ~he Workshop so a physical inspection could be made, and would adjourn after this had been done. Building Official Leffingwell spoke first, giving a short history of how this situation came to her attention. She said a letter was re- ceived from an attorney representing the adjoining property owner, Andre Martinovic, 4203 Tranquility Dr ., regarding a pool deck and other related pool equipment not meeting the 4' setback requirement. She advised she had contacted Mr. Andreu and advised he would have to move all that was beyond the 4' requirement, and requested that both parties have new surveys done. She said this was accomplished and also that to date Mr. Andreu has moved some pavers and the pool pump; however, there is a section of the deck which is supported by pilings and it is this section the request for variance applies to. Mr. Andreu then addressed the Board, saying he and his wife have been the sole owners of the house, which he had built with the aid of the general contractor in 1979, and the deck had been positioned where it now was since the house was built. He further stated that the house at 4203 Tranquility Dr. had been built in 1982 and and changed hands in 1987, during which year Mr. Andreu re-built the pool deck because it had been put in the wrong way originally and was sinking. He hired a civil engineer to design the support and it was at this time that the cement beams had been put in place. The third owner, Mr. Martinovic, urchased the house at 4203 Tranquility Dr, in 1991, and it was only ~en that any exception had been taken to Mr. Andrews pool deck not eeting the 4' setback requirement. He told the members that the beam Board of Adjustment Workshop Meeting - Minutes . January 26, 1993 Page 2 of 2 support for that corner of the deck is crucial, which is why he applied for the variance, and said he would be willing to plant a "privacy" fence of trees or other materials to block view of the deck from the Martinovic property. As regards the error in violating the 4' setback, Mr. Andreu said he felt the original landscape architect had been responsible when he had planted a hedge over the south property line. During the course of Mr. Andrews remarks, the members reviewed the drawings he had submitted. Andre Martinovic, accompanied by his attorney, Carla Brown, next ad- dressed the Board. Mr. Martinovic spoke first, taking issue with Mr. Andrews presentation of the facts. He said the petition did not meet the conditions under which a variance could be favorably considered in that Mr. Andreu was not a "layman," but a professional contractor (electrical) knowledgeable in areas of construction. Mr. Martinovic said that when an engineering report regarding the re-building of the deck in 1987 had been requested and received by Ms. Leffingwell in September 1992, it made no mention of inspections, but did state there was a discussion between Mr. Andreu and the engineer during which the engineer had been instructed by Mr. Andreu to modify the design of the deck to other than the plans approved by the Town and for which a • permit had been granted. Mr. Martinovic also said he doubted the importance of the placement of the supporting beam(s) referred to in the petition, saying that shortening the corner would improve the stability of the deck. In conclusion, Mr. Martinovic said that Mr. Andreu had created the encroachment of property and had violated Town Code and, therefore, there was no hardship to be considered. Ms. Brown then spoke briefly, corroborating her client's position. At this time, Chairman Cohen acknowledged the presentations given and set the Public Hearing on the petition for Friday, February 12 at 9:30 A.M. He then recessed the meeting to accommodate a physical in- spection of the properties. The Workshop was adjourned at 10:40 A.M. dmt APPROVE: Haro B, en, airman Jane Rayner, S re ary /~. /~ ~ ~ oS'~ N % `- Ro er Se y, Vice airman ~!G%~~ Nei W, ur ~~ ~. Dance C. Stump