1998.04.17_TC_Minutes_Special TOWN OF HIGHLAND BEACH MINUTES OF TOWN COMMISSION MEETING SPECIAL MEETING Fridav, April 17, 1998 9.30 A M Mayor Arlin G. Voress called the Special Meeting to order in Commission Chambers at 9:30 A.M., advising its purpose was to consider the awarding of a bid for the elevated water tank rehabilitation project. Town Clerk Doris Trinley called the roll. The Mayor, Vice Mayor Thomas J. Reid, and Commissioners Michael W. Hill and John J. Sorrelli were present. Commissioner David Augenstein was absent. Town Attorney Thomas E. Sliney and Town Manager Mary Ann Mariano were also present, as were Utilities Director Jack W. Lee and representatives of CH2M HILL. No one from the general ,public was in attendance. At the Mayor's request, Ms. Mariano gave a brief background of the project and advised that the bid opening was held on April 2, 1998. She then asked Steve Lavinder, CH2M HILL Project Engineer, to address the bids received and to answer any questions the Commission might have. Mr. Lavinder reported that four (4) firms were invited to bid and two (2) declined because of already busy schedules. Of the two (2) bids received, it was CH2M HILL's recommendation, in conjunction with Tank Industry Consultants, Inc., to award the base bid, and additive alternates, to G & M Painting Enterprises, Inc. in the amount of $163,300. ,This price included a $7,300 credit for removal of existing roof stiffeners, rather than cleaning and painting them. The Commission was assured that the stiffeners were necessarily installed as part of the initial erection process and served no purpose at the present time. Technical and financial discussion followed, with questions being answered to the Commission's satisfaction, including Town Attorney Sliney's notations on overruns/penalties, and insurance issues as advised by Burke, Bogart and Brownell. Concluding discussion, the following MOTION by COMMISSIONER SORRELLI/VICE MAYOR REID was unanimously approved by roll call vote: THE TOWN COMMISSION ACCEPTS G & M PAINTING ENTERPRISES, INC. BASE BID, AND ADDITIVE ALTERNATES, FOR THE ELEVATED WATER STORAGE TANK REHABILITATION PROJECT IN THE AMOUNT OF $163,300.00. Town Manager Mariano noted that because the bid amount exceeded the $90, 000 originally budgeted for the project, there would need to be `Y t ' • Minutes of Town Commission Meeting Apiril 17, 1998 Special Meeting Pale 2 of 2 a transfer of funds at the end of the fiscal year to account for the difference. There being no further business to come before the Commission at this time, Mayor Voress adjourned the Special Meeting at 9:50 A.M. upon MOTION by VICE MAYOR REID/COMMISSIONER HILL. Note: A copy of CH2M HILL's April 15, 1998 letter and a copy of Tank Industry's April 8, 1998 letter are attached hereto and made part of these Minutes. dmt APPROVE: ~~'~ - ~~ Arlin G. Voress, Mayor .~ ~ ~ n'`~~~14'~ GYY~t ~.afi , ~v Thomas J. Reid, Vice Mayor • -ABSENT- David Mic el i~J. Hill, Commissioner ~~ ssioner ~'~G c,t-~~~~~ _ ~_~ ~ -~ ~-c_.f~ -Ct h J. Sorrell r, Commissioner ATTE / ~' ~~ ' ~' ~~ CH2MHILL 1 April 15,1998 145967.HT Ms. Mary Ann Mariano Town Manager Town of Highland Beach 3614 S. Ocean Boulevard Highland Beach, FL 33487 Dear Ms. Mariano: CH2M HILL Hillsboro Executive Center North 800 Fairway Drive Suite 350 Deerfield Beach, FL 33441-1831 Tel 954.426.4008 Fax 954.698.6010 Subject: Recommendation of Award for the Elevated Storage Tank Rehabilitation Project- Recoating Interior Wet and Dry Areas of the Elevated Tank The bid opening for the above-referenced project was held April 2,1998. Two bids were received and CH2M HILL, in association with Tank Industry Consultants, has reviewed the bids for conformance with the bidding specifications. Both of the contractors who sub- mitted bids are considered to be highly qualified tank painting contractors who are capable of completing the work specified in this project and within the time frame identified. A summary of the bids is provided below: Contractor Base Bid Additive Alternates Total Cost G&M Painting Enterprises, Inc. $148,100 $22,500 $170,600 Security Painting Co. $141,890 $53,440 $195,330 Engineer's Estimate ~ $146,000 $90,000 $236,000 Tank Industry Consultants evaluated these bids and each bid is in conformance with the bid requirements. A copy of their bid evaluation is attached. The base bid cost as provided by each contractor is reasonable based on the Engineers estimate of $146,000. It should be noted that the work included in the base bid of this project is more than that identified in the original tank evaluation report prepared by Tank Industry Consultants and used by the Town to develop the $90,000 budget for this project. During the preparation of specifications for this project, additional work items were recom- mended to be added into this project to take advantage of having a contractor on-site and to complete work that was closely associated with painting the interior wet portion of the tank. The additional work items and conditions included in the base bid that contributed to the higher bid prices include: ~ . Ms. Mary Ann Mariano • Page 2 April 15, 1998 145967.H'T • Spot repairs of existing damaged exterior areas • Access tube ladder extension and slip-resistant rungs • New roof manhole • New pedestal screens • Accelerated painting schedule to allow the tank to be painted before hurricane season begins • Use of a high quality paint Although these items increased the cost of the base bid, we believe that the Town will receive the added benefits of completing this work now rather than deferring these costs to the future. In addition, it is recommended that the additive alternate work, which included a new access tube extension with new manhole and spot rehabilitation of the interior dry surfaces, be also included in the project. T'he prices obtained for this work were considerably lower • than that estimated by Tank Industry Consultants and are reasonable for the work speci- fied. Each contractor has been contacted and has verified that their bids are accurate and will include the work specified for each additive alternate. It is recommended that the Town award the contract for both the base bid and additive alternate work to G&M Painting Enterprises, ~vho submitted the low cost bid for the total work of $170,600. In addition, G&M Painting Enterprises submitted a deductive alternate for only removing the existing roof stiffeners in the tank rather than cleaning and painting them by offering a credit of $7,300. The roof stiffeners were required as part of the initial erection process and currently serve no purpose. Accepting this credit, it is recommended that the Town award this project to G&M Painting Enterprises for a total cost of $163,300. Please contact me if you have any questions or if you require any additional information. Sincerely, CH2M HILL ~~ i David Schuman, P.E. Project Engineer DFB \ 981050002 \ 1sb531. doc APR 08 '98 04~59Ph1 TANK INDUSTRY HQ • TANK INDUSTRY CQNSUI,TANTS INC. 7740 Nest New York Street Indianapolis, Indiana 46214 317/271-3100 -Phone 317 / 271-3300 -FAX Ellicott City. Maryland 410/715-9330 Irving, Texas 972!719-2so7 Ronkonkoma, Npw Xotk 516!467-6661 Apri18, 1998 Mr. David Schuman Project Engineer CHZM Hill 800 Fairway Drive, Suite 350 Deerfield Beach, Florida 33441 P.3 RE: Bid Review for the Repairing and Repainting the Interior and Spot Cleaning and Spot Painting the Interior Dry Surfaces of Qne 500,000 Galion Steel Fluted Pedestal Tank, "H.B. Elevated Tank," Highland Beach, 1;lorida; TIC 98-FL-F510.01 Dear Mr. Schuman: We received your bid tabulation and copies of the bids for the two bidders. TIG has reviewed the bid information which you sent us and both bids appear to be in order. The other two potential bidders uldtcated that they were too busy this spring to take on any new projects. Qrlando, Florida ' 407l8st-5745 i Ifthe Town of Highland Beach wishes to award the contract for the Total Corona, California Amount Bid, then TIC recommends that the Town award the contract to 909!273-3427 ; Security Painting Company for the amourn of $141,890. • If the Town wants to award the alternate bid items to extend the access tube, spot clean and spot paint the interior dry (as opposed to merely spot cleaning and spot painting the interior dry areas damaged during the repairs), and remove the interior roof stiffeners, then TIC recommends that the Town award the contract to G&M Painting Enterprises for the amount of $163,300. I have contacted G&M Painting Enterpnseg and Kim Gugudis assured me that he would do the work for the price bid. Mr. Gugudis also indicated that Alternate Bid Item 9 is a ~' deduct of $2,800 to remove the interior roof stiffeners and not have to clean and paint the stiffeners. j If you have any questions or comments, please call, ~ Sincerely, T Il~DUSTRY CONSULTANTS Todd D. Moore, P.E. Chief Engineer x:\wordlProjeccs1F514.00~F510.011bid revicw ltr.doc An Employee-Owned Company