Loading...
2003.10.23_BOAHC_Minutes_RegularBUILDING PERMIT REVIEW COMMITTEE OCTOBER 23, 2003 AGENDA I . DISCUSSION - RE: PLAN REVIEW FEES 2. DISCUSSION - RE: REVIEW OF WHAT WORK REQUIIRES PERMITS AND APPLICABLE CHARGES FOR THAT WORK 3. DISCUSSION:RE: SHOULD PERMIT FEE BE DIFFERENT FOR WORK DONE IN VOLUME VERSUS INDIVIDUAL OCCURANCES 4. DISCUSSION - RE: REVIEW OF MENU ITEMS VERSUS INCREASES IN PERCENTAGE FOR PERMIT (BOB DAWSON ATTACHMENT) 5. DISCUSSION - RE: HOW OVERHEAD AND PROFIT SHOULD PLAY INTO PERMIT FEES - RETAIL VALUE VERSUS CONSTRUCTION VALUE 6. DISCUSSION - RE: SHOULD THE COST OF PERMITS BE INCREASED 7. DISCUSSION - RE: SUBMITTING PERMITS AS A WHOLE S. OTHER ITEMS FOR DISCUSSION TOWN OF HIGHLAND BEACH BUILDING ORDINANCE COMMITTEE MEETING MINUTES October 23 2003 9:30 a.m. Present at today's meeting were: Resident Neil Burd, Resident Vic Hadeed, Builder Jeff Norman, Condo Manager Mona Texeira, Town Attorney Tom Sliney, Commissioner John Sorrelli, Building Official Bob Dawson and Town Manager Ben Saag. Commissioner Sorrelli was absent. 1) Plan Review Fees: Mr. Dawson noted that the building department currently does not charge a plan review fee. He stated that a reason for charging would be to recoup money for time spent to review plans and recoup money for time spent to review plans should the projects never be built. It was discussed that this should be set aside and look at other ways of charging fees and costs, but then was decided to leave as is. 2) What work requires permits and applicable charges for that work: One of the largest problems of which permits are not pulled is for tile work and kitchen cabinets (refacing does not require a permit). It was recommended to add wood flooring. Soundproofing will be up to individual condo. It was recommended to delete the $2.00 contractor registration charge. (Next meeting agenda item - Bob's recommendation of how we charge permits) 3) Should permit fee be different for work done in volume vs. individual occurrences: Permit fee for volume vs. individual occurrences: i.e. one water heater vs. 50 water heaters. After discussion it was decided to leave permit fee per unit and not offer a volume fee. 4) Menu items vs. increases in percentage for permit (attachment): Proposed fees were discussed. 5) How overhead and profit should play into permit fees - retail value vs construction value: Bob Dawson referenced chart on page 3 of the fees package. Mr. Norman noted that construction value does not included profit and overhead of builder. (This item has been tabled until the next scheduled meeting) 6) Should the cost of permits be increased: This item tabled until the next scheduled meeting. 7) Submitting permits as a whole: Permits come in up front .... (audio unclear) No. 5 & 6 will be carried over to the next scheduled meeting. No. 2 may be rediscussed should any committee member have additional thoughts. The next meeting was scheduled for Monday, November 17, 2003 at 9:30 a.m. Meeting was adjourned at 10:45 a.m. Highland Beach Code of Ordinances PART 1 CODE OF ORDINANCES I Chapter 6 BUILDINGS AND STRUCTURES* I ARTICLE VI. PLUMBING' I Sec. 6-152. Same --Amendments, deletions and additions. Appendix H, permit Fees (Section 104.7.4 of the Standard Building Code), is amended as follows: The application for a plumbing permit shall be accompanied by the following fee: Fixture Installed (each) ... $ 25.00 Remote Fixture (each) ... 50.00 Water Heater (each) ... 50.00 Grease Trap (each) ... 100.00 Sewer Connection —On Site ... 50.00 Water Service --On Site ... 50.00 Catch Basins ... 50.00 Hose Bib (each) ... 40.00 Remote Hose Bibs (Car Wash, Recreational Showers) ... 50.00 Drains Connected to Storm Drain (each) ... 50.00 Irrigation Systems ... 50.00 Window Sprinklers ... 50.00 Ponds (each) ... 100.00 Fountains (each) ... 100.00 Waterfalls (each) ... 100.00 LP Gas Tanks ... 100.00 Domestic Backflow Preventer ... 35.00 Minimum Permit Fee ... 35.00 Temporary Sales Trailers or Construction Trailers ... 500.00 Fees shall be quadrupled for any work commenced without a permit. No permit shall be issued until the fee prescribed under this section shall have been paid. Nor shall an amendment to a permit be approved until the additional fee, if any, due to the additional work, shall have been paid. A reinspection fee of fifty dollars ($50.00) per unit shall be charged for each reinspection made due to the rejection of work or due to the fact that work was not ready at the time This is an excerpt, other code sections may also apply. Page 1 I Highland Beach Code of Ordinances PART 1 CODE OF ORDINANCES / Chapter 6 BUILDINGS AND STRUCTURES* / ARTICLE IX. ELECTRICAL CODE* / Sec. 6-234. Amendments, deletions, additions. Schedule —Electric Permit Fees AMPERES 60— 99 Per $ 35.00 Individual Panel Replacement not permitted on new construction AMPERES 100--199 Per Individual Panel $200.00 AMPERES 200-399 Per Individual Panel $300.00 AMPERES 400--600 Per Individual Panel $400.00 Above 600 ampere panels not permitted. Three (3) phase service --The above fees shall be doubled. Swimming Poo/s—$35.00. Change of Service--$50.00. Town approved sale or construction trailers $500.00. Exception —For a single service to a single circuit the permit fee shall be $35.00. Remodeling Fees —Minimum electric permit will be $35.00. For each outlet over five (5) an additional fee of $1.00 per outlet shall be charged in addition to the minimum permit. Remote outlets shall be $10.00 per outlet. Temporary Service --For new construction permit will be $100.00. Emergency Generators—$50.00; over 10kw $100.00. Fire sprinklersystem—$35.00 plus $1.00 per sprinkler head. No permit shall be issued until the fee prescribed under this section shall have been paid. Nor shall an amendment to a permit be approved until the additional fee, if any, due to additional work, shall have been paid. This is an excerpt, other code sections may also apply. Page 1 Hiahland Beach Code of Ordinances PART 1 CODE OF ORDINANCES / Chapter 6 BUILDINGS AND STRUCTURES* / ARTICLE Vill. MECHANICAL INSTALLATIONS / Sec. 6-202. Mechanical fee schedule. Sec. 6-202. Mechanical fee schedule. The minimum fee for any permit issued under this article shall be thirty-five dollars ($35.00). Central air conditioners (per ton (12,000 BTU) or fraction thereof) ... $ 15.00 Reverse cycle A/C (per ton or fraction thereof) ... 15.00 Window units (reverse cycle or straight cool) (per 1,000 BTU) ... 10.00 Heat strips (for each 1,000 units or fraction thereof) ... 5.00 Cooling towers or roof top compressors ... 250.00 a. Existing (recirculating system and noncity water systems only permitted) ... 250.00 b. New construction (noncity water systems only permitted) ... 250.00 C. If crane is necessary (add administrative fee): Up to 2 stories ... 100.00 Above 2 stories ... 500.00 Remote refrigeration (walk-in cooler) ... 200.00 Duct work —For each and every drop, return, plenum, air or exhaust vent, smoke and fire dampers ... 10.00 No permit shall be issued until the fee prescribed under this section has been paid; nor shall an amendment to a permit be approved until the additional fee, if any, due to additional work, shall have been paid. A reinspection fee of fifty dollars ($50.00) per unit shall be charged for each reinspection made due to the rejection of work or due to the fact that work was not ready at the time specified in the request for inspection, or failure to call for inspection. Payment of such fee must be made prior to the reinspection. Permit fees shall be quadrupled for any work commenced without a permit. This is an excerpt, other code sections may also apply. Page 1 Town of Highland Beach 3614 SOUTH OCEAN BOULEVARD • HIGHLAND BEACH, FLORIDA 33487 Palm Beach County, Florida 561-278-4548 FAX 561-265-3582 Do you need a Building Permit? Florida Building Code Chapter 1 Administration 104.1 Permit application Mayor: Thomas J. Reid Vice Mayor: Michael W. Hill Commissioners: John J. Sorrelli Robert L. Lowe Rachael Scala -Piston Town Manager: Ben Saag §104.1.1 When required. Any owner, authorized agent, or contractor who desires to construct, enlarge, alter, re air, move, demolish, or change the occupancy or occupant content of a building or structure, or any outside area being used as part of the building's designated occupancy (single or mixed) or to erect, install, enlarge, alter, repair, remove, convert or replace any electrical, gas, mechanical or plumbing system, the installation of which is regulated by the technical codes, or to cause any such work to be done, shall first make application to the building official and obtain the required permit for the work. The following specific items are included with the above and require a permit: Any changes to exterior doors or windows. Any changes to Fire Sprinkler System. Install ceramic tile, marble, terrazzo, etc. Replace Kitchen and/or Vanity cabinets. Changes to and/or replacement of plumbing or electrical fixtures Permits are not required to: Paint, wallpaper, install wood flooring, install decorative moldings, reface (not replace) kitchen and/or vanity cabinets. Replace appliances such as dishwasher, refrigerator, stove, wash machine, dryer. If any of these non permit items affect Fire Sprinklers and/or Fire Alarms, they will require a permit to insure that life safety systems are not comprised. Contractors: Contractors are required to have a Certificate of Competency (License) for the type of work they are performing. The Town registers contractors. Ask to see both the contractors Highland Beach Registration form and their Certificate of Competency. Owner/Builder Chapter 489 Florida Statutes prohibits Owner/Builder permits in multi -family buildings. C:\100\Building Dept Policy Manual\Permit Required.doc 3/4/02 Revised: Page 1 of 1 www.highla,ndbeh.com Proposed Fees Building: Currently 1% Value of work change minumium fee to $40.00 for $1000 in value $ 15.00 / 1000 or portion of valuation to $200,000 $ 12.50 / 1000 or portion above $200,000 $ 25.00 Hurricane Shutter Certification Paperwork* $ 25.00 Record Search for Unpermitted work* Plan Review Fees: $ 200.00 New or Replacement SFR Commercial Alteration over ?? Residential Alteration over ?? Reinspection Fees: (All work) $ 50.00 Unproductive trip free 1st reinspection (same item) $ 50.00 2nd reinspection (same item) $ 100.00 3rd reinspection (same item) $ 200.00 4th reinspection (same item) requires qualifier at site Miscellaneous: (Building) $ 250.00 Demo SFR* by county Palm Beach County Impact Fees Miscellaneous: (All) $ 50.00 Failure to call for final inspection (close out job)* $ 50.00 Reinstate expired permit for final inspection (they call)* $ 10.00 Revisions to plans requiring review after initial review / page revised* $ 50.00 Change of Contractor Contractors Registration: $----3:00 State regulated (FS 205.065, AGO 93-19) $ 2-M Palm Beach County regulated* w/county occ lic $ 35.00 Palm Beach County regulated* w/o county occ lic * No State registration or certification Work Started w/o Permit: still applies if application has been filed 4X Fee may be reduced by building official to 2X for special conditions, Max penalty limited to $1,000.00 CM 001Fees\Proposed Fees.xls - Building Value of Work: Value of work that includes sub -trade work includes fees for those sub - trades if employed by prime permit applicant. IProvided sub -trade applications are submitted with prime application. (Separate fees applied to sub -trades otherwise. Prime applicant may submit a worksheet showing total value, less itemized list of sub -trade permits not Printed 8:49 AM 10/23/2003 Proposed Fees Mechanical: Value of Work $ 50.00 Change of Equipment < 5 tons (60,000 BTU's) $ 100.00 Change of Equipment >= 5 tons (60,000 BTU's) delete Crane Fee Electrical: Value of Work $ 50.00 Temporary Pole $ 75.00 Service Change Electrical Specialty: Value of work $ 50.00 Residential Alarm Systems, Security Systems �l U Miscellaneous: (sub trades) Value of work ti4 $ 50.00 Central Vacuum Systems13�' Plumbing: Value of Work $ 50.00 Water Heater Change -out of Work: Value of work that includes sub -trade work includes fees for those sub -trades employed by prime permit applicant. Provided sub -trade applications are submitted with prime application. Separate fees applied to sub -trades otherwise. Prime applicant may submit a worksheet showing total value, less itemized list of sub -trade permits not included. include Natural Gas (by sanitary plumber with general plumbing) $ 50.00 Natural Gas (Separate contractor)n $-45-e0—LP Gas (Specialty License required) U�ic� U �' $ 50.00 Backfiow recertification (� Pools: Also include Waterfalls, ponds, fountains. Value of Work Fire Suppression: (Fire Sprinklers) Value of work Florida Surcharges: (State Required) 0.005 DCA Square Foot of area under Roof 0.005 BCAIB Square Foot of area under Roof C:1100\Fees\Proposed Fees.xls - Sub -Trades Printed 8:49 AM 10/23/2003 �. Proposed Fees Should sales and /or construction trailers have special charges? Value: The major difficulty here is how does one determine value, and what does it include? We could make a statement that the value of a new / replacement dwelling is assumed to be $200 sq ft.A/c area, $140 sq ft non A/c area under roof. Or a special category for new/replacement dwelling of so much per sq ft. however it is somewhat difficult to determine that sq ft fee if a sliding scale is used for the fee. Could base a sq ft fee on a $1,000,000. value for a 3000 sq ft building We use terms: New meaning a new building, Replacement meaning a new building replacing a building that was demolished, Replacement does not have Town impact fees, is not counted as a new dwelling unit for US Census report. C:\100\Fees\Proposed Fees.xls - Remarks Printed 8:49 AM 10/23/2003