Loading...
1983.06.15_CEB_Minutes_WorkshopTOWN OF HIGHLAND BEACH, FLORIDA 0 CODE ENFORCEMENT BOARD Workshop Meeting June 15, 1983 The Workshop Meeting was called to order by Chairman Roehner at 9:30 A.M. Those in attendance were: Soll Roehner, Chairman; Ellen Gerber, Secretary; John Chironna; Robert Scholz; Albert Approbato; Robert Myers; and Donald Sherbondy. Mr. Novak was absent. Also in attendance were: Tony Abbate, Code Enforcement Officer; and Rita Ebersole, Deputy Town Clerk. Chief Jones and Tom Sliney, Town Attorney entered toward the end of the Workshop meeting. Ellen Gerber read the minutes of the Workshop meeting of May 18, 1983. Mr. Abbate advised the Board that Third Wind (Citation #02198) had removed the concrete stairs and paid fines to the Department of Natural Resources. They have submitted drawings and applied for permits to build wooden stairs. The Town may issue these permits after approval from DNR is received. Re Violations #02214 and 02215: Le Concord was solving the problem today with the cooperation of Florida Power and Light and Southern • Bell. The collapsed wall was removed and the violations satisfied, Mr. Abbate reported. The Massengill-Moore property was discussed. Mr. Sliney said the Town Commission has the matter under advisement and will soon make a decision. The interiors of these buildings and the landscaping were not completed by June 7th as per agreement. The Workshop Meeting adjourned at 10 : 00 A.M. / ) APPROVED: Soll Roehner Chairman J6Kn Chironna Ellen Gerber, Secretary Albert Approbato 2 Robert cholz Ro "ert Myers �� Donald Sherbondy ATTEST: Date; �/ ��