Loading...
1983.03.04_PB_Minutes_Specialr MINUTES: PLANNING COMMISSION/LOCAL PLANNING AGENCY, TOWN OF HIGHLAND BEACH, FLORIDA. MARCH 4, 1983. FIELD TRIP. CORONADO GUARD- HOUSE (WEST) . •Members of the Planning Commission/Local Planning Agency, Town of Highland Beach, Florida, met on Friday, March 4, 1983, at 9:00 a.m., at the site of the Coronado project 3400/3420 South Ocean Blvd. (West). Present: Dr. G. P. Weiss, E. L. Snyder, W. J. Wernecke, C. Nastri, Dr. A. E. Tomeski Absent: Dr. G. C. Linn, I. S. Saunders The field trip was called for a review of the gate house under construction. Dr. G. P. Weiss, Chairman noted that after a careful review of minutes and tapes, it is apparent that none of the present members of the Planning Com- mission have reviewed any construction plans regarding the West side Coron- ado project property. Dr. Weiss advised that some members of the present Planning Commission had reviewed and made recommendations covering the Beach Club on the East Side of AlA. Dr. Weiss also noted that the signatures on the construction plans and the tapes on file will bear out that this only covers the East property. Following the field trip, it was the consensus of those members present that due to the early stages of construction, it is apparently too early to de- termine what the finished product will look like. Dr. Weiss suggested that • the structure and its finished product be reviewed at a later date. Copy of letter addressed to Vice Mayor Mary Louise G. APPROVED: 0 Dr. G' ert P: Weiss, Chairman W J. Pernecke, Secretary dr1 / S Dr. A. E. Tomeski Lucille S. Miller Recording Secretary . Nastri osser, is attached. Vice Chairman